Last Updated on 5 years by Mumbai Metro City
Mumbai Line 3 (Colaba–Bandra-SEEPZ line) is 33.5-km long line will be the first underground metro line in Mumbai. The metro line will connect Cuffe Parade from south Mumbai to to SEEPZ in the north-central Mumbai. It will have 26 underground and one at-grade station.
| List of stations – Mumbai Metro Line 3 Colaba–Bandra-SEEPZ | ||||
|---|---|---|---|---|
| # | Station Name | Connections | ||
| 1 | Cuffe Parade | None | ||
| 2 | Vidhan Bhavan | None | ||
| 3 | Churchgate Metro | Western Line (Churchgate) | ||
| 4 | Hutatma Chowk | None | ||
| 5 | CSMT Metro | Central Line (CSTM Station – Local) Harbour line (CSTM Station – Local) Indian Railways (CSTM Station – Mail) |
||
| 6 | Kalbadevi | None | ||
| 7 | Girgaon | None | ||
| 8 | Grant Road | Western Line (Grant Road) | ||
| 9 | Mumbai Central Metro | Western Line (Mumbai Central – Local) Indian Railways (Mumbai Central – Mail) |
||
| 10 | Mahalaxmi | Western Line (Mahalaxmi) Monorail |
||
| 11 | Nehru Science Museum | None | ||
| 12 | Acharya Atrey Chowk | None | ||
| 13 | Worli | None | ||
| 14 | Siddhivinayak | None | ||
| 15 | Dadar | Western Line (Dadar) Central Line (Dadar) Indian Railways (Dadar Terminus) |
||
| 16 | Shitaladevi | None | ||
| 17 | Dharavi | None | ||
| 18 | BKC | Line 2 (Under Construction) | ||
| 19 | Vidyanagri | None | ||
| 20 | Santacruz | None | ||
| 21 | Domestic Airport | Line 7 (Under Construction) | ||
| 22 | Sahar Road | Line 7 (Under Construction) | ||
| 23 | International Airport | Line 7 (Under Construction) | ||
| 24 | Marol Naka | Line 1 (Operational) | ||
| 25 | MIDC | None | ||
| 26 | SEEPZ | Line 6 | ||
| 27 | Aarey Depot | None | ||